In plain words
Contractors rent cranes, generators and labour camps for their projects. The question is whether these rentals are simply expensed. Under IFRS 16, if the contract gives control of a specific asset, the contractor recognises a right-of-use asset and a lease liability, unless the lease is 12 months or less or the asset is of low value. Heavy plant is not low value. Rent expense is replaced by depreciation and interest.
Why it matters
Contractors historically expensed crane, generator and labor-camp rentals as incurred; under IFRS 16 almost all such arrangements (beyond genuinely short-term or low-value items) require a right-of-use asset and lease liability on-balance-sheet, which changes EBITDA (rent expense is replaced by depreciation and interest), inflates gross assets and liabilities, and directly affects debt covenants (gearing, current ratio) that lenders monitor closely on already leveraged contracting balance sheets.
Diagnostic questions
Does the arrangement give you the right to control the use of a specific, identified crane, generator, or camp (rather than an interchangeable pool of equipment) for a period of time? Do you direct how and for what purpose the identified asset is used throughout that period? Does the arrangement qualify for the short-term (12 months or less) or low-value asset exemption, or must a right-of-use asset and lease liability be recognized? Is the discount rate used to measure the lease liability appropriate given the project's currency, term, and your incremental borrowing rate?
Recognition
- Identify whether the arrangement is a lease: does it convey the right to control the use of an identified asset (a specific crane or camp, not an interchangeable pool) for a period in exchange for consideration?
- Apply the short-term exemption (lease term of 12 months or less at commencement, including renewal options reasonably certain to be exercised) and the low-value asset exemption (assessed on an absolute basis, e.g. small tools) where genuinely applicable; do not apply low-value to heavy plant.
- For all other leases, recognize a right-of-use asset and a lease liability at the commencement date based on the lease term (including reasonably certain extension/termination options tied to project duration).
- Separate lease and non-lease components (e.g. crane rental versus operator/maintenance services) unless applying the practical expedient to combine them.
- Reassess the lease term and remeasure the liability if project duration extends materially or an option's exercise becomes reasonably certain.
Measurement
Measure the lease liability at the present value of remaining lease payments discounted at the rate implicit in the lease or, more commonly for contractors where that rate is not readily determinable, the entity's incremental borrowing rate reflecting the project's currency, term and the lessee's credit standing. Measure the right-of-use asset at the amount of the lease liability plus initial direct costs, prepayments and estimated dismantling/restoration costs, less lease incentives; depreciate over the shorter of the lease term and useful life. Subsequently increase the liability for interest and reduce it for payments made; remeasure both the liability and asset for lease modifications or reassessed terms.
Presentation & disclosure
Disclose: (1) right-of-use assets by class of underlying asset (equipment, camps, offices), separately from owned PP&E or as a separate line; (2) lease liabilities split current/non-current; (3) depreciation charge on right-of-use assets and interest expense on lease liabilities, separately from other depreciation/finance costs; (4) total cash outflow for leases; (5) short-term and low-value lease expense recognized on a straight-line basis; (6) information about variable lease payments not included in the liability, extension/termination options, and residual value guarantees.
Common mistakes
- Continuing to expense heavy equipment rentals monthly as an operating cost because the arrangement is invoiced monthly, without assessing whether it meets the lease definition
- applying the low-value exemption to major cranes or batching plants because individual monthly payments look small, rather than assessing the underlying asset'
- s value when new
- failing to include reasonably certain extension options in the lease term when project delays make continued use highly likely
- not separating embedded service components (operator, maintenance, fuel) from the lease payment, overstating the lease liability
- missing site restoration/dismantling obligations embedded in camp or facility leases that should be included in the right-of-use asset cost.
Simple example
A contractor leases a tower crane for an 18-month project at SAR 45,000 per month, with no separately identifiable service component and an incremental borrowing rate of 6% per annum. The present value of 18 monthly payments of SAR 45,000 at 6% p.a. (0.5% per month) is approximately SAR 771,000. Journal entry at commencement: Dr Right-of-use asset - equipment 771,000 Cr Lease liability 771,000 Month 1: interest accrues on the liability and the first payment is made: Dr Interest expense 3,855 Cr Lease liability 3,855 Dr Lease liability 45,000 Cr Cash 45,000 Month 1 depreciation of the right-of-use asset (straight-line over 18 months, no residual value): Dr Depreciation expense 42,833 Cr Accumulated depreciation - right-of-use asset 42,833
Professional judgment
Determining the lease term for project-based equipment is genuinely judgmental where the underlying project timeline itself is uncertain (delays, variations extending scope), a 'reasonably certain' extension assessment should track the project's own schedule risk, not just the stated contractual renewal option, and should be revisited whenever the project forecast changes materially. Selecting an incremental borrowing rate for project-specific, often USD- or SAR-denominated financing with limited observable market rates requires a build-up approach (risk-free rate plus entity credit spread plus asset/currency adjustments) that is inherently estimation-heavy. Distinguishing a lease of a specific identified asset from a service contract for capacity (e.g. a concrete supply arrangement where the supplier can substitute any batching plant) also requires judgment about substitution rights in substance, not merely as stated in the contract.
Source basis
IFRS 16 · Leases
Paragraph references
Verified against the official standard texts used in the IFRS Expert skill.
Related issues
- IFRS 15Over-time revenue recognition and progress measurement
- IFRS 15Variations, claims and disputes in contract price
- IAS 37Onerous (loss-making) construction contracts
- IFRIC 12Service concession arrangements: financial asset or intangible asset model
- IFRS 15 / IFRS 9Retentions, advances and contract balances
- IFRS 9Expected credit losses on government and mega-project receivables
Educational and navigation content only. Not professional advice. Does not reproduce official IFRS/IAS text. Consult the authoritative standards and qualified professionals; professional judgment may still be required.